Hoping to Have the Bathroom Closed Before Winter / LOG CABIN Building (S4 Ep5)
I continued with framing in the bathroom and with my father we did the installed the water lines before closing the floor. I hope to have the bathroom at the cabin before the snow and below zero temperatures arrive.
Thank you for watching!